A Cleft sweet chestnut fence around a lake near Devizes and
a guard rail fence was repaired in Westbury
All with no raincoat required !!
March 2024
Cleft rail fences, also known as chestnut fences, are constructed using split logs. We used 2.4m. Commonly, these logs have pre-shaped ends that fit snugly into mortices in the fence posts. This design allows the rails to slot into the timber posts easily. Sweet chestnut does not require any treatment to help improve its lifespan – the timber contains natural preservatives. There is no industry standard for the length of the logs given their curved and bendy nature.
Our Takeuchi TB230 Compact has been busy this week! Fitted with a rotating grab makes the moving of brash in a tight woodland a smooth operation, stacking it ready for chipping
The new digger has been busy this week, fitted with a rotating grab making moving of brash in a tight woodland a smooth operation, stacking ready for chipping.
Benefits for you:
Compact machine
Powerful with High Hydraulic oil flow
Easily moved between sites by 4×4
Rotating Handling grab for a wide range of tasks incl:
handling of cut brash & timber
removal of fences
excavation works in small spaces
tree removal when fitted with tree shear
The Takeuchi TB230 Compact Excavator offers operators a powerful operating performance. Offering the largest cab on a 3-tonne weight class excavator, equivalent to a 6-tonne cab size.
Designed for Success The TB230 design features a rounded body for improved visibility and functionality. The conventional tail swing with reduced overhang provides outstanding stability.
Stage V Ready <19kW Meeting all low emission regulations, with maximum efficiency and power the TB230 does not require any exhaust after-treatment systems.
3-Tonne Cab or Canopy We have opted for a cab. A proven high-performance machine with excellent power, greater torque and first-class hydraulic system for faster cycle times and productivity on site.
Pick Your Mode Economy and High Altitude Modes, allow the operator to choose the operating mode best suited to the application.
Power to Perform Powerful arm and bucket breakout forces provide an outstanding blend of speed, power, and versatility.
Switch Activated Blade Float is now fitted as standard to maximize ground finishing on site.
Replacement gates were erected today for West Lavington Parish Council.
The gates are sited at the entrance to the Remembrance Avenue of trees planted to commemorate 25 members of the village who went to serve their country in WW1 but did not return.
The site lies between the village and Salisbury Plain military training estate.